Journal of Petrochemical Universities
  Journals
  Publication Years
  Keywords
Search within results Open Search
Please wait a minute...
For Selected: Toggle Thumbnails
The Characteristics Analyze of Water and Gas Production of Air⁃Foam Flooding Reservoir
Yang Yongchao, Lü Xinqian, Shang Qinghua, Guo Maolei, Bai Yanwei
Abstract429)   HTML    PDF (1348KB)(314)      
This research adjusted the water flooding characteristic curves in the application of the water, oil and liquid production characterization of air⁃foam flooding reservoir. The numerical simulation method is used to analyze and predict the production performance of air foam flooding reservoir in the stable production stage. Four types of water flooding curves are used in the application of both direct air⁃foam flooding reservoir and the air⁃foam flooding reservoir after water flooding. The results suggest that the type⁃D water flooding characteristic curve is better than other curves in the application of the direct air⁃foam flooding reservoir. The type⁃C and type⁃D water flooding characteristic curves are better performed in the application of the air⁃foam flooding reservoir after water flooding. The characteristic curve of gas production is calculated based on the method proposed by H. R Warner, and can be used to predict the gas⁃oil ratio within three years after the gas breakthrough is stable. Therefore, the gas production volume can be calculated.
2020, 33 (2): 29-36. DOI: 10.3969/j.issn.1006-396X.2020.02.006
Preliminary Exploration of CO 2 Flooding Phase of Yanchang Oilfield
Yang Yongchao,Yao Zhenjie
Abstract599)      PDF (1454KB)(271)      
Phase of CO 2 flooding is studied, combining with MMP and maximum gas injection pressure in the study area. The results show that the MMP is 22.2 MPa. The fracture pressure of formation is 33.88 MPa. The maximum gas injection pressure of wellhead is 15.8 MPa. The gas injection pressure is 10.5 MPa, and corresponding injection gas pressure of well bottom is 19.1 MPa. CO 2 flooding belongs to immiscible flooding. When the gas injection pressure of wellhead is increased to 15.0 MPa, the bottom hole pressure is 23.6 MPa, which is higher than the minimum miscible pressure, there is miscible zone near the well area in the gas injection well.
2018, 31 (02): 61-64. DOI: 10.3969/j.issn.1006-396X.2018.02.011
 

Study and Application of Multi Slug Compounding Profile Control and Flooding Technology in Zhidan Shuanghe Oil Block

Wang Weibo, Yang Yongchao, Kang Xiaoyu
Abstract289)      PDF (1520KB)(51)      
 

Aimming at the problem of shorter validity period during early flooding stage for low permeability fractured reservoirs in Shuanghe oil block from Zhidan oil field, a technical study and application of multistage compounding flooding was carried out. Based on the profile and flooding mechanism of different slugs, the agents were screened and evaluated indoor. Consumption volume, slug combinations, displacement volume and pressure in flooding scheme were optimized. Field test for SH 69 well proved that using the multi slug compound flooding way of polymer protected slug + high cure system + delayed swelling gel system + delayed crosslinking gel system, the climbing pressure was 2.2 MPa, the start up pressure of injection well was increased with 0.72 MPa effectively, and injectivity index was reduced with 1.9 m3/(d·MPa), which had an obvious effect of controlling water and increasing oil for corresponding wells. The valid period for this type of flooding was up to six months or more, which achieved the integration process of control and flooding, realizing the target of adjusting water injection profile and increasing oil recovery.

2016, 29 (2): 49-54. DOI: 10.3969/j.issn.1006-396X.2016.02.010